Email Archives for October, 2022 by subject
- AMMRL BSMS Error: BfbBisStringParameter::AppendChunk: BIS Checksum Error
- AMMRL Facility Director Position at the University of New Mexico
- AMMRL: 500 MHZ BB probe needed
- AMMRL: administering a MNova site license
- AMMRL: Agilent 7620AS and broken samples in probe
- AMMRL: Cleaning a spectrometer after water gets into it from compressed air line
- AMMRL: digitizer interface
- AMMRL: Fcube2 and CubeManager Error
- AMMRL: FSU is hiring for an NMR specialist, Position # 00051834
- AMMRL: GREAT 3/60 Master Unit
- AMMRL: Helium Recovery - Pipe Size
- AMMRL: Helium survey compilation
- AMMRL: Info about back pressure controller and oil adsorber
- AMMRL: Instrument Computer Security
- AMMRL: keeping a magnet at low temperature
- AMMRL: LCB board needed
- AMMRL: NMR Careers in Canada
- AMMRL: NMR Facility Manager at Loyola University in Chicago
- AMMRL: Opening for Solid-State NMR Spectroscopist at the University of Illinois
- AMMRL: Problem with edprosol nuclei list
- AMMRL: quantitative HSQCs
- AMMRL: Scripps Research NMR Core is hiring NMR Spectroscopist
- AMMRL: Searching for RXC/AQR board ECL04
- AMMRL: Solved: BSMS Error: BfbBisStringParameter::AppendChunk: BIS Checksum Error
- AMMRL: Two persistent issues on NEO: "TRX Errors" and "instrument not able to read the probe".
- AMMRL: UCI hiring NMR Facility Manager
- Summary: AMMRL: keeping a magnet at low temperature
- Summary: AMMRL: Problem with the edprosol list
- Last message date: Mon Oct 31 2022 - 04:10:49 MST
- Archived on: Wed Oct 25 2023 - 14:50:00 MST